Skip to content

Spending guardrails

FinZot’s amortized budget already lowers spending when the portfolio falls, without a rule. This recipe is for a rule you want to state explicitly, such as “cut discretionary spending while the trailing five-year real return is under 4%”.

  1. Mark what can be cut. Every expense you would give up in a bad year is a flexible expense with a floor, and everything else is mandatory. A floor of 0% means the expense can be eliminated. Lower priorities are cut first (expenses and healthcare).
  2. Write the condition as a named formula. real_portfolio_return is the year’s return after inflation, and ROLLING_AVG over it counts only the years that have happened, so the rule is correct from the first plan year (formula language, planner variables):
    OR(ROLLING_AVG(real_portfolio_return, 5) < 4%, real_portfolio_return < -20%)
  3. Write the budget as a second named formula that reads the condition. Ceiling and floor are the totals you would spend in a good and a bad year, in today’s dollars:
    IF(cut_rule, FUTURE_DOLLARS(60_000), FUTURE_DOLLARS(100_000))
  4. Attach the budget to a spending policy. Create a policy covering the years the rule should govern, choose the Custom formula strategy, and size it from the budget formula (variable spending). Mandatory expenses always fund in full, flexible expenses compress toward their floors in priority order, and any budget left over is spent as discretionary.

In a year the rule fires, the budget drops to the floor and the flexible expenses absorb the cut. In every other year the plan spends the ceiling.

  • Drawdown from a peak. Cut while the portfolio is more than 20% below its high:
    invested_assets / ROLLING_MAX(invested_assets, 100) - 1 < -20%
    The starting balance counts as a prior high, and a large window is an all-time high. Deposits and withdrawals move this ratio, which is why the return-based rule above exists.
  • Withdrawal rate. Cut while last year’s budget was more than 6% of the portfolio:
    LAG(spending_budget / FUTURE_DOLLARS(1), 1) * FUTURE_DOLLARS(1) / LAG(invested_assets, 1) > 6%
    spending_budget is the yearly budget a spending phase set (planner context). Dividing by FUTURE_DOLLARS(1) inside the LAG puts last year’s budget in today’s dollars. Multiplying by FUTURE_DOLLARS(1) outside puts it in this year’s dollars. LAG(invested_assets, 1) is the balance the year opened with, which is what a household knows when it sets the year’s budget. invested_assets without the LAG already carries this year’s return. To count everything the household spent, use consumption in place of spending_budget. consumption adds loan interest and a home’s costs, which FinZot pays outside the budget.
  • Graded cuts. Replace the IF with a CASE that steps the budget down as the trailing return worsens.

Some rules keep last year’s budget and change it only when a condition is met. FinZot records the yearly budget each spending phase sets, and spending_budget reads it. Name this formula held_budget. It starts at $100,000 and holds that in today’s dollars. It cuts 10% in a year cut_rule fires and raises 10% in a year raise_rule fires:

IF(LAG(spending_budget, 1) = 0,
FUTURE_DOLLARS(100_000),
LAG(spending_budget / FUTURE_DOLLARS(1), 1) * FUTURE_DOLLARS(1)
* IF(cut_rule, 90%, IF(raise_rule, 110%, 100%)))

LAG(spending_budget, 1) is 0 when no spending phase covered the year before. The formula checks for that 0 first and sets the starting amount. A rule built on last year’s budget reads 0% in that year, so the check has to come before the rule. After another phase, LAG(spending_budget, 1) is that phase’s budget, and the formula carries it on.

A phase that starts partway through a year spends only that part of the budget in its first year. spending_budget still reads the full yearly amount, so the next year holds the full $100,000.

Do not name a formula spending_budget. A named formula with that name replaces the variable, and LAG cannot look back at a named formula.

  • Do not approximate the real return as portfolio_return - inflation_rate. The error is small in ordinary years and largest in a crash, in the direction that hides the damage, and it can delay the cut by a year.
  • Do not hand-roll a trailing average out of LAG. A return lagged to before the plan started reads 0, so (x + LAG(x, 1) + LAG(x, 2) + LAG(x, 3) + LAG(x, 4)) / 5 divides one year by five in the first plan year and reads a fifth of the true return. A “below 4%” rule written that way stays on for four years. ROLLING_AVG(x, 5) divides by the years it actually saw.
  • Do not carry consumption forward as next year’s budget. consumption includes loan interest and a home’s costs. FinZot pays those outside the budget (variable spending). A budget set to last year’s consumption adds them again every year. Take a budget that should hold at $60,000 in today’s dollars, in a plan with $13,000 a year of mortgage interest and home costs. The budget reads $73,000 the next year and $86,000 the year after. Carry LAG(spending_budget, 1) forward instead.
  • Do not let a held budget fall below what the plan must spend. FinZot pays mandatory expenses in full when the budget is below them. A budget that is cut year after year keeps falling while spending stays at that floor. The rule then compares a budget nobody spent, and a later raise starts from the lower number. Wrap the budget in MAX with the mandatory spending: MAX(FUTURE_DOLLARS(50_000), held_budget). The Medicare premiums FinZot adds are mandatory expenses inside the budget, so count them in that amount.
StrategyWhere it lands
4% rule (initial percentage, inflation adjusted)A spending policy sized as a fixed amount in today’s dollars, set to 4% of the starting portfolio.
VPW, variable percentage withdrawalThe amortized budget. It is the same arithmetic with taxes built in.
Guyton-KlingerA budget that holds until a rule fires. The cut rule is the withdrawal-rate variation above, and the raise rule is the same test with < and the lower rate. Both read last year’s budget from LAG(spending_budget, 1).
Drawdown guardrailThe drawdown variation above.
Risk-based guardrails, set by probability of successThe risk-based guardrails recipe.

Time-series functions cannot look back at a named formula. A rule reads the budget it set last year through spending_budget. Any other value a rule wants from last year has to be written out in place inside the LAG.